News reports that EDF is set to announce new delays and cost overruns for Hinkley Point C have been described by the Stop Hinkley Campaign as “unsurprising”. However, they should act as a red flag to further nuclear expansion in the UK and slam the breaks on for Sizewell C and so-called Small Modular Reactors.