• Skip to primary navigation
  • Skip to main content
  • Skip to footer
Stop Hinkley

Stop Hinkley

Campaign against nuclear power in the South West

  • Home
  • About Us
  • News & Events
    • Press Releases
    • News
    • The Cannington Chronicler
    • Newsletters
    • Events
  • Information
    • Information
    • Books, Reports & Stickers
    • Leaflets & Posters
    • Video
  • Please Support Us
  • Contact Us
  • Archive
  • Main Menu Widget Area

    • Facebook
    • Twitter

Further Hinkley Point C Cost Increases and Delays should be a Red Flag for Further Nuclear Expansion.

29th March 2022

News reports that EDF is set to announce new delays and cost overruns for Hinkley Point C have been described by the Stop Hinkley Campaign as “unsurprising”. However, they should act as a red flag to further nuclear expansion in the UK and slam the breaks on for Sizewell C and so-called Small Modular Reactors.

Read More: PressRelease290322

Filed Under: Hinkley C, Latest, News, Nuclear New Build

Footer

What is the real cost of nuclear power?

No one knows, until the final bill for dealing with the waste has been totted up in thousands of years. EdF and the UK government are planning to dump the waste, and the costs of managing it, onto future generations.

Stop Hinkley was founded in 1983

We played a major part in the 14-month public enquiry in 1988/9  and continued to campaign for alternative renewable energy sources and energy conservation measures.

The closure of Hinkley A was announced in May 2000 as a result of our campaigning.

Support us

We have successfully fought against nuclear power and will continue to do so - but we need your support

Copyright © 2020–2022, Stop Hinkley · Site by Lynx Graphic Design